N/A
7358
Sqm
For Sale
Planning Zone and Parameters
Planning Zone – B2
Building Density 90%
Site Coverage 50%
Max number of floors 2
- Major infrastructure of the Mari Oil & Gas Terminal
- – The area having been identified as the only coastal heavy industry zone available in Cyprus
- – Surrounded by major Services of Electricity, Water and Telecomunications
- – A multi million upgrade of the area
- – Oil Products trading
- – LNG trading
- – Oil and Gas derivative products manufacture
- – Oil and Gas infrastructure including distribution networks, storage and processing facilities
- – Provision of services to the offshore industry
- – Repair and maintenance of offshore installations, vessels, and related equipment.
- – Waste to Energy Plant
- – Proposed Power Plant 80MW
High Potential, Investment opportunity
Property Location
Tochni, Cyprus
Get in Touch
Similar Listings
No similar listings found